Guide for architects and consultants · 2026

Bike Shelter in BREEAM, LEED and WELL certification

A solar shelter with e-bike charging supports earning credits across four major green building certification systems. Check which requirements it meets in your project; an assessor or certification consultant confirms final qualification.

Summary

Potential contribution to BREEAM, LEED, WELL and DGNB certification

BREEAM
support
Tra: cycling infrastructure
LEED
support
LT: Bicycle Facilities
WELL
support
Movement: active mobility
DGNB
support
Mobility infrastructure

A solar bike shelter with e-bike charging helps meet the requirements of four major green building certification systems, in the transport, mobility and wellbeing categories. It fits BREEAM most directly (cycling infrastructure, e-bike charging, comfort, security); in LEED and WELL it is one element of a broader credit that also needs long-term storage, showers and access to a cycling network.

Important caveat: The building or project is certified, not the shelter itself. The figures on this page are upper bounds on the contribution for typical configurations; an assessor or certification consultant confirms final credit qualification for the specific project.
Credit potential calculator

Where a shelter can support earning credits

A simplified estimate based on BREEAM In-Use v6, LEED v4.1, WELL v2 and DGNB. The certifying assessor confirms final credits.

10
510
200
2010002000
Estimate, not a ruling:The numbers below are a simulation based on your inputs. An assessor or certification consultant confirms the actual credit count for the specific project.
BREEAM
In-Use v6 · Tra 03
2
/ 4 pts
programme estimate, confirmed by the assessor
  • Lighting + monitoring → +1 pt (security)
  • E-bike charging → +1 pt (low-emission vehicle support)
LEED
v4.1 · LT Bike
2
/ 2 pts
programme estimate, confirmed by the assessor
  • Long-term storage ≥5% of occupants → 1 pt
  • Secure, accessible spaces → +1 pt
WELL
v2 · Movement V01
3
/ 3 pts
programme estimate, confirmed by the assessor
  • Min. 1 space per 40 occupants → 1 pt
  • Covered, lit → +1 pt
  • E-bike charging (active mobility) → +1 pt
DGNB
Mobility
4
/ 5 pts
programme estimate, confirmed by the assessor
  • Mobility infrastructure base → 1 pt
  • Comfort and security → +1 pt
  • E-mobility integration → +2 pts

Get the documentation package for your assessor

Technical data sheet, CE declaration, PV specification and description of the charging function, in the format assessors expect for BREEAM/LEED/WELL/DGNB.

Your configuration
Number of charging points:10
users:200
Options:charging, lighting, security
BREEAM points:2/4 BREEAM · 2/2 LEED · 3/3 WELL · 4/5 DGNB

This decides which product line applies.

0/2000

BREEAM Tra 03 (Cyclist Facilities)

The most detailed system on cycling infrastructure. The Tra 03 criterion scores the number and quality of parking spaces, and how many credits a project earns depends on the building's occupancy and the rest of the facility.

Credit 1: ratio of spaces to occupants

1 pt

At least 1 cycle parking space per 10 regular building occupants (residents / employees / students). A shelter with 10 charging points covers a building with 100 occupants.

ChargeGo: met with at least one 10-point shelter per 100 occupants

Credit 2: increased provision (1:7)

+1 pt

A ratio of 1:7 (1 parking space per 7 occupants) or better. This credit rewards a higher share of cycling infrastructure, for example in "bike-friendly" residential schemes and offices.

ChargeGo: a 10-point shelter for 70 occupants (1:7)

Credit 3: security and comfort

+1 pt

Covered, well-lit spaces (≥ 50 lx) with the option of monitoring by camera or visibility from the building. Frame locking, not just the wheel.

ChargeGo: LED lighting with a sensor, IP camera as an option, frame locking

Credit 4: low-emission vehicle support

+1 pt

Charging for e-bikes and e-scooters. A credit often missed by "shelter only" projects, because it needs electrical infrastructure for low-emission vehicles.

ChargeGo: 230 V sockets (3 to 10, depending on the Open Shelter / Lockable Shelter variant) with current metering and app-based authorisation

LEED v4.1 LT Bicycle Facilities

An American system, popular with international corporations. LT (Location and Transportation) includes the Bicycle Facilities credit, which a solar shelter helps meet. The final score also depends on the building type, the cycling network and sanitary facilities; showers and changing rooms are required for some project types.

Long-term storage

1 pt

Long-term spaces (≥4 hours) for at least 5% of regular building occupants. Must be covered and secure. For an office with 200 employees, that's 10 spaces.

Applies to: BD+C (New Construction), EBOM (Existing Buildings: Operations & Maintenance), ID+C (Interior Design + Construction)

Security, lighting and location

+1 pt

Spaces within 200 feet (~60 m) of the main entrance, well lit, with monitoring. A structure that protects against theft (frame locking, not just the wheel).

LEED v4.1 relaxed the requirements compared with earlier versions.

WELL v2 Movement (active mobility)

The newest of the four, focused on occupant health. The Movement concept rewards strategies that support active commuting, movement and healthy habits, and a shelter is one piece of infrastructure for active occupants. How features map to points (V01, V04 and so on) depends on the WELL scorecard and a consultant's confirmation.

Base requirement
1 pt

Min. 1 parking space per 40 regular building occupants. So for 200 employees, that's 5 spaces.

Comfort and security
+1 pt

Cover, lighting ≥50 lx, protection against vandalism (monitoring or visibility).

Active mobility
+1 pt

Support for active transport: e-bike charging counts as active mobility infrastructure.

DGNB Mobility Infrastructure

A German system, popular in Poland on projects financed with DACH capital (Germany, Austria, Switzerland). More comprehensive in the mobility area.

DGNB's "Mobility Infrastructure" category assesses support for sustainable mobility. A bike shelter with charging counts toward several sub-categories at once, with a DGNB auditor making the final assessment:

  • Bicycle infrastructurecovered parking spaces
  • E-mobility integrationelectric bike charging
  • Renewable energy on siteroof-mounted photovoltaics, renewables category
  • Comfort & safetylighting, monitoring, intuitive operation

A contribution to the Mobility category, particularly relevant for multi-family residential projects aiming for DGNB Gold or Platinum. Final qualification depends on the assessor and the version of the system.

Sample documentation package for your assessor
Technical data sheets, CE declaration, description of the charging function, PV specification. Leave your email and we'll send a sample package.
By sending this you accept our privacy policy. We keep your data for a maximum of 2 months.

Which system to choose

The choice of certification system follows the investment context rather than the shelter: the capital behind it, the country, the building category.

BREEAM

The most common system in Poland for office and residential projects. A British system, with a Polish chapter (BRE Polska). Suited to commercial-lease investments.

Typically for: Offices, shopping centres, build-to-rent residential
LEED

The standard for international corporations with US capital. Many large global tenants require LEED when choosing an office.

Typically for: Class A offices leased to US-based companies
WELL

The newest system, focused on employee health. Often added as an overlay certification alongside BREEAM/LEED. Popular in modern Class A+ offices.

Typically for: Premium offices, tech / financial-sector employees
DGNB

A German standard. Used on projects financed with DACH capital, especially residential and logistics schemes.

Typically for: Developer residential projects, DACH-financed projects
A quote for your specific certified project
Tell us which system (BREEAM, LEED, WELL, DGNB) and what stage your project is at, and we'll come back with a configuration and documentation in 1–2 business days.
By sending this you accept our privacy policy. We keep your data for a maximum of 2 months.

When to add a shelter to the project cycle

A certification pre-assessment estimates possible credits from the concept design. Cycling infrastructure added at this stage needs no later revision of the site plan.

Concept

BREEAM/LEED pre-assessment

The assessor determines the potential number of credits, including for the shelter. This is when you decide the ratio of spaces to occupants, how many shelters, and where on the site.

Building design

Shelter specification in the documentation

The shelter appears in the site development plan. Specify the exact model, dimensions and materials, because the assessor checks the supplier's documentation.

Construction

Installed alongside the building

The shelter is usually installed in parallel with the main building. Installing it after handover works too, though the certification documentation takes more effort to complete.

Certification

Inspection and credit award

The auditor inspects the site, verifies the number of spaces and checks the supplier's documentation (CE, certificates) against the declarations. ChargeGo shelters ship with a ready documentation package.

Renewal (In-Use)

Every 3–5 years

BREEAM In-Use and LEED EBOM are renewed on a cycle. Infrastructure already in place is reassessed at renewal rather than rebuilt.

Questions about shelters and certification

When is it worth considering cycling infrastructure as part of a certification path?+

When the project already plans cycle parking. The transport criteria are then met with a one-off investment and no ongoing running costs. Cost per credit depends on the specific project, which the assessor or consultant prices out.

At what point in the design cycle should we think about a shelter?+

As early as possible: at the concept stage and the BREEAM/LEED pre-assessment, when the auditor makes an initial estimate of achievable credits. Adding a shelter at the construction stage works too, and requires revising the site development plan. For buildings renewing a certification (In-Use), it can go in at any point in the cycle.

Does a shelter on an adjacent plot (for example a municipal car park) also count?+

For BREEAM, usually yes, if the distance from the main entrance is no more than 100 m and the facility is accessible to the building's users. LEED has a similar requirement (100 ft = 30 m for short-term, 200 ft for long-term). The exact requirement depends on the protocol (NC, EBOM, ID+C), so confirm with your assessor.

Does a shelter without charging still count?+

The transport criteria are built around cycle parking spaces: covered, lit and secured. E-bike charging is a separate strand, under the criteria on low-emission vehicles and active mobility. An assessor evaluates both.

Does ChargeGo provide the documentation a certifier needs?+

Yes. Customers ordering a shelter get a documentation package: technical data sheet, CE declaration of conformity, EU manufacturing certificate (CoC), PV and energy storage specification, description of the charging function and LED illuminance measurements, in the format Polish BREEAM/LEED assessors expect.

Documentation package for your assessor

For BREEAM/LEED/WELL/DGNB certified projects we supply the full documentation set: technical data sheets, CE declaration, PV specification and description of the charging function.

Your configuration
Number of charging points:10
users:200
Options:charging, lighting, security
BREEAM points:2/4 BREEAM · 2/2 LEED · 3/3 WELL · 4/5 DGNB

This decides which product line applies.

0/2000
See also

Resources you might find useful

Bike Shelter and BREEAM, LEED, WELL Certification | ChargeGo